{"id":976,"date":"2023-11-21T14:29:35","date_gmt":"2023-11-21T14:29:35","guid":{"rendered":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/?post_type=glossari&#038;p=976"},"modified":"2023-11-22T11:17:35","modified_gmt":"2023-11-22T11:17:35","slug":"glossario-meccanico","status":"publish","type":"glossari","link":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/glossari\/glossario-meccanico\/","title":{"rendered":"Glossario meccanico"},"content":{"rendered":"\n<table id=\"tablepress-22\" class=\"tablepress tablepress-id-22\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">francese<\/th><th class=\"column-2\">inglese<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">accessoires de levage annuel<\/td><td class=\"column-2\">lifting\u00a0\u00a0accessories annual<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">aeration assainissement des locaux de travail annuel &#8211; locaux \u00e0 pollution non sp\u00e9cifique<\/td><td class=\"column-2\">ventilation for sanitation of work spaces annual &#8211; spaces with non specific pollution\u00a0<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">aeration assainissement des locaux de travail annuel &#8211; tous locaux \u00e0 pollution sp\u00e9cifique<\/td><td class=\"column-2\">sanitation ventilation of work spaces semi-annual &#8211; all premises with specific pollution\u00a0<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">aeration assainissement des locaux de travail semestriel &#8211; locaux \u00e0 pollution sp\u00e9cifique avec syst\u00e8me de recyclage<\/td><td class=\"column-2\">sanitary ventilation of work spaces semi-annual &#8211; premises with specific pollution using a recycling system<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">ambiance de travail<\/td><td class=\"column-2\">workplace climate<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">amiante<\/td><td class=\"column-2\">asbestos<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">amiante &#8211; v\u00e9rification de l&#8217;\u00e9tat des structures et du niveau d&#8217;empoussi\u00e8rement<\/td><td class=\"column-2\">asbestos &#8211; checking the condition of structures and the level of dust<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">analyse\u00a0\u00a0eaux pluviales<\/td><td class=\"column-2\">analysis storm water<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">analyse\u00a0\u00a0eaux us\u00e9es<\/td><td class=\"column-2\">analysis wastewater<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">analyse concentration fibre amiante\u00a0<\/td><td class=\"column-2\">analysis asbestos fibre concentration\u00a0<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">analyse phys.bact.legionella<\/td><td class=\"column-2\">analysis phys.bact.legionella<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">appareils\u00a0\u00a0de levage et leurs accessoires<\/td><td class=\"column-2\">lifting devices and their accessories<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">ascenseurs &#8211; monte charge &#8211; escaliers mecaniques &#8211; trottoirs roulants<\/td><td class=\"column-2\">lifts &#8211; freight elevators &#8211; escalators &#8211; moving walkways<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">ascenseurs &#8211; monte charge &#8211; escaliers mecaniques &#8211; trottoirs roulants annuel<\/td><td class=\"column-2\">lifts &#8211; freight elevator &#8211; escalators &#8211; moving walkways annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">ascenseurs &#8211; monte charge &#8211; escaliers mecaniques &#8211; trottoirs roulants semestriel<\/td><td class=\"column-2\">lifts &#8211; freight elevator &#8211; escalators &#8211; moving walkways semi-annual<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">ascenseurs 5ans<\/td><td class=\"column-2\">lifts 5 yrs<\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">ascenseurs monte-charges annuel<\/td><td class=\"column-2\">lifts freight elevators annual<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">ascenseurs toutes les 6 semaines<\/td><td class=\"column-2\">lifts every 6 weeks<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">audit\/auto-controle<\/td><td class=\"column-2\">audit \/ self-control<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">auto-contr\u00f4le annuel obligatoire<\/td><td class=\"column-2\">mandatory self-control annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">auto-contr\u00f4le volontaire<\/td><td class=\"column-2\">voluntary self-control<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">bloc autonome \u00e9clairage s\u00e9curit\u00e9 &#8211; erp &#8211; v\u00e9rification mensuelle<\/td><td class=\"column-2\">autonomous safety lighting block &#8211; erp &#8211; monthly verification<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">bloc autonone \u00e9clairage de s\u00e9curit\u00e9 &#8211; erp &#8211; v\u00e9rification semestrielle\u00a0<\/td><td class=\"column-2\">autonomous lighting block &#8211; erp &#8211; biannual verification\u00a0<\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">bruit<\/td><td class=\"column-2\">noise<\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">bruit icpe 3 ans<\/td><td class=\"column-2\">noise bpi 3 years<\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">carnet sanitaire<\/td><td class=\"column-2\">health book<\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">causerie sant\u00e9\/s\u00e9curit\u00e9<\/td><td class=\"column-2\">health &amp; safety talk\u00a0<\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">colonnes seches annuel<\/td><td class=\"column-2\">dry columns annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">compacteurs a dechets, bennes \u00e0 ordures m\u00e9nag\u00e8res avec syst\u00e8me de compactage des d\u00e9chets<\/td><td class=\"column-2\">trash compactors, garbage dumpsters with waste compaction system<\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">contr\u00f4le de l&#8217;efficacit\u00e9 energ\u00e9tique biannuel : 400 kw > p\u00a0\u00a0< 20 mw<\/td><td class=\"column-2\">energy efficiency control biannual: 400 kw> p <20 mw<\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">contr\u00f4le des acces<\/td><td class=\"column-2\">access control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">contr\u00f4le des emissions polluantes biannuel 400 kw < p > 2 mw<\/td><td class=\"column-2\">polluting emissions control biannual 400 kw <p> 2 mw<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">contr\u00f4le pour les installations icpe ( p>2mw ) des rejets atmosph\u00e9riques &#8211;\u00a0\u00a0triennal<\/td><td class=\"column-2\">control bpi installation (p> 2 mw) air emissions &#8211; triennial<\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">controle prestation accueil<\/td><td class=\"column-2\">reception service control<\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">controle prestation alarmes &amp; incendie<\/td><td class=\"column-2\">alarms &amp; fire service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">controle prestation autres energies et fluides<\/td><td class=\"column-2\">energy and other fluids service control<\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">controle prestation contradictoire accueil<\/td><td class=\"column-2\">contradictory reception service control<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">controle prestation contradictoire alarmes &amp; incendie<\/td><td class=\"column-2\">contradictory alarms &amp; fire service control<\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">controle prestation contradictoire autres energies et fluides<\/td><td class=\"column-2\">contradictory energy and other fluids service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">controle prestation contradictoire contr\u00f4le d&#8217;acc\u00e9s\/anti-intrusion<\/td><td class=\"column-2\">contradictory access control \/ anti-intrusion service control<\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">controle prestation contradictoire contr\u00f4le r\u00e9glementaire<\/td><td class=\"column-2\">contradictory regulatory control service control<\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">controle prestation contradictoire courrier<\/td><td class=\"column-2\">contradictory mail service control<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">controle prestation contradictoire coursier \/ express\u00a0<\/td><td class=\"column-2\">contradictory courier \/ express service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">controle prestation contradictoire d\u00e9chets industriels banals<\/td><td class=\"column-2\">contradictory general industrial waste service control<\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">controle prestation contradictoire d\u00e9chets industriels sp\u00e9ciaux<\/td><td class=\"column-2\">contradictory special industrial waste service control<\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">controle prestation contradictoire eau<\/td><td class=\"column-2\">contradictory water service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">controle prestation contradictoire \u00e9lectricit\u00e9<\/td><td class=\"column-2\">contradictory electricity service control<\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\">controle prestation contradictoire gardiennage<\/td><td class=\"column-2\">contradictory guard service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\">controle prestation contradictoire gaz<\/td><td class=\"column-2\">contradictory gas service control<\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\">controle prestation contradictoire gestion de la t\u00e9l\u00e9phonie<\/td><td class=\"column-2\">contradictory telephony management service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\">controle prestation contradictoire gestion des espaces verts<\/td><td class=\"column-2\">contradictory green space management service control<\/td>\n<\/tr>\n<tr class=\"row-53\">\n\t<td class=\"column-1\">controle prestation contradictoire impressions libre service \/ fa\u00e7onnage<\/td><td class=\"column-2\">contradictory self service printing \/ bindery service control<\/td>\n<\/tr>\n<tr class=\"row-54\">\n\t<td class=\"column-1\">controle prestation contradictoire informatique<\/td><td class=\"column-2\">contradictory informatics service control<\/td>\n<\/tr>\n<tr class=\"row-55\">\n\t<td class=\"column-1\">controle prestation contradictoire maintenance g\u00e9n\u00e9rale<\/td><td class=\"column-2\">contradictory general maintenance service control<\/td>\n<\/tr>\n<tr class=\"row-56\">\n\t<td class=\"column-1\">controle prestation contradictoire management du site<\/td><td class=\"column-2\">contradictory site management service control<\/td>\n<\/tr>\n<tr class=\"row-57\">\n\t<td class=\"column-1\">controle prestation contradictoire propret\u00e9 \/ hygi\u00e8ne<\/td><td class=\"column-2\">contradictory cleanliness \/ hygiene service control<\/td>\n<\/tr>\n<tr class=\"row-58\">\n\t<td class=\"column-1\">controle prestation contradictoire reprographie \/ impression \/ fa\u00e7onnage<\/td><td class=\"column-2\">contradictory reprographics \/ printing \/ bindery service control<\/td>\n<\/tr>\n<tr class=\"row-59\">\n\t<td class=\"column-1\">controle prestation contradictoire standard<\/td><td class=\"column-2\">contradictory standard service control<\/td>\n<\/tr>\n<tr class=\"row-60\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux cvc<\/td><td class=\"column-2\">contradictory hvac work service control<\/td>\n<\/tr>\n<tr class=\"row-61\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux d&#8217;am\u00e9nagement<\/td><td class=\"column-2\">contradictory development work service control<\/td>\n<\/tr>\n<tr class=\"row-62\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux de b\u00e2timent<\/td><td class=\"column-2\">contradictory building work service control<\/td>\n<\/tr>\n<tr class=\"row-63\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux d&#8217;entretien des b\u00e2timents<\/td><td class=\"column-2\">contradictory building maintenance work service control<\/td>\n<\/tr>\n<tr class=\"row-64\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux d&#8217;installations techniques<\/td><td class=\"column-2\">contradictory technical installation work service control<\/td>\n<\/tr>\n<tr class=\"row-65\">\n\t<td class=\"column-1\">controle prestation contradictoire travaux \u00e9l\u00e9ctrique<\/td><td class=\"column-2\">contradictory electric work service control<\/td>\n<\/tr>\n<tr class=\"row-66\">\n\t<td class=\"column-1\">controle prestation contr\u00f4le d&#8217;acc\u00e9s\/anti-intrusion<\/td><td class=\"column-2\">access control \/ anti-intrusion service control<\/td>\n<\/tr>\n<tr class=\"row-67\">\n\t<td class=\"column-1\">controle prestation contr\u00f4le r\u00e9glementaire<\/td><td class=\"column-2\">regulatory control service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-68\">\n\t<td class=\"column-1\">controle prestation courrier<\/td><td class=\"column-2\">mail delivery service control<\/td>\n<\/tr>\n<tr class=\"row-69\">\n\t<td class=\"column-1\">controle prestation coursier \/ express<\/td><td class=\"column-2\">courier \/ express service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-70\">\n\t<td class=\"column-1\">controle prestation d\u00e9chets industriels banals<\/td><td class=\"column-2\">general industrial waste service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-71\">\n\t<td class=\"column-1\">controle prestation d\u00e9chets industriels sp\u00e9ciaux<\/td><td class=\"column-2\">special industrial waste service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-72\">\n\t<td class=\"column-1\">controle prestation eau<\/td><td class=\"column-2\">water service control<\/td>\n<\/tr>\n<tr class=\"row-73\">\n\t<td class=\"column-1\">controle prestation \u00e9lectricit\u00e9<\/td><td class=\"column-2\">electricity service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-74\">\n\t<td class=\"column-1\">controle prestation gardiennage<\/td><td class=\"column-2\">guard service control<\/td>\n<\/tr>\n<tr class=\"row-75\">\n\t<td class=\"column-1\">controle prestation gaz<\/td><td class=\"column-2\">gas service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-76\">\n\t<td class=\"column-1\">controle prestation gestion de la t\u00e9l\u00e9phonie<\/td><td class=\"column-2\">telephony management service control<\/td>\n<\/tr>\n<tr class=\"row-77\">\n\t<td class=\"column-1\">controle prestation gestion des espaces verts<\/td><td class=\"column-2\">green space management service control<\/td>\n<\/tr>\n<tr class=\"row-78\">\n\t<td class=\"column-1\">controle prestation impressions libre service \/ fa\u00e7onnage<\/td><td class=\"column-2\">self service printing \/ bindery service control<\/td>\n<\/tr>\n<tr class=\"row-79\">\n\t<td class=\"column-1\">controle prestation informatique<\/td><td class=\"column-2\">information service control<\/td>\n<\/tr>\n<tr class=\"row-80\">\n\t<td class=\"column-1\">controle prestation maintenance g\u00e9n\u00e9rale<\/td><td class=\"column-2\">general maintenance service control<\/td>\n<\/tr>\n<tr class=\"row-81\">\n\t<td class=\"column-1\">controle prestation management du site<\/td><td class=\"column-2\">site management service control<\/td>\n<\/tr>\n<tr class=\"row-82\">\n\t<td class=\"column-1\">controle prestation propret\u00e9 \/ hygi\u00e8ne<\/td><td class=\"column-2\">cleanliness \/ hygiene service control<\/td>\n<\/tr>\n<tr class=\"row-83\">\n\t<td class=\"column-1\">controle prestation reprographie \/ impression \/ fa\u00e7onnage<\/td><td class=\"column-2\">control delivery reprographics \/ printing \/ bindery<\/td>\n<\/tr>\n<tr class=\"row-84\">\n\t<td class=\"column-1\">controle prestation standard<\/td><td class=\"column-2\">control of standard service<\/td>\n<\/tr>\n<tr class=\"row-85\">\n\t<td class=\"column-1\">controle prestation travaux cvc<\/td><td class=\"column-2\">hvac works service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-86\">\n\t<td class=\"column-1\">controle prestation travaux d&#8217;am\u00e9nagement<\/td><td class=\"column-2\">development work service control<\/td>\n<\/tr>\n<tr class=\"row-87\">\n\t<td class=\"column-1\">controle prestation travaux de b\u00e2timent<\/td><td class=\"column-2\">building works service control<\/td>\n<\/tr>\n<tr class=\"row-88\">\n\t<td class=\"column-1\">controle prestation travaux d&#8217;entretien des b\u00e2timents<\/td><td class=\"column-2\">building maintenance work service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-89\">\n\t<td class=\"column-1\">controle prestation travaux d&#8217;installations techniques<\/td><td class=\"column-2\">technical installation work service control<\/td>\n<\/tr>\n<tr class=\"row-90\">\n\t<td class=\"column-1\">controle prestation travaux \u00e9l\u00e9ctrique<\/td><td class=\"column-2\">electric works service control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-91\">\n\t<td class=\"column-1\">controle sst prestataire<\/td><td class=\"column-2\">sst control service<\/td>\n<\/tr>\n<tr class=\"row-92\">\n\t<td class=\"column-1\">contr\u00f4le sst prestataire >400 heures<\/td><td class=\"column-2\">sst control provider > 400 hours<\/td>\n<\/tr>\n<tr class=\"row-93\">\n\t<td class=\"column-1\">controles prestation contradictoires<\/td><td class=\"column-2\">contradictory service controls\u00a0<\/td>\n<\/tr>\n<tr class=\"row-94\">\n\t<td class=\"column-1\">controles prestations<\/td><td class=\"column-2\">controls on services<\/td>\n<\/tr>\n<tr class=\"row-95\">\n\t<td class=\"column-1\">controles reglementaires<\/td><td class=\"column-2\">regulatory controls<\/td>\n<\/tr>\n<tr class=\"row-96\">\n\t<td class=\"column-1\">controles specifiques non reglementaires<\/td><td class=\"column-2\">specific non-regulatory controls<\/td>\n<\/tr>\n<tr class=\"row-97\">\n\t<td class=\"column-1\">contr\u00f4les sst autre prestataire<\/td><td class=\"column-2\">controls for sst from another provider<\/td>\n<\/tr>\n<tr class=\"row-98\">\n\t<td class=\"column-1\">desenfumage annuel<\/td><td class=\"column-2\">smoke removal annual<\/td>\n<\/tr>\n<tr class=\"row-99\">\n\t<td class=\"column-1\">detection incendie semestriel<\/td><td class=\"column-2\">fire detection semi-annual<\/td>\n<\/tr>\n<tr class=\"row-100\">\n\t<td class=\"column-1\">detection intrusion<\/td><td class=\"column-2\">intrusion detection<\/td>\n<\/tr>\n<tr class=\"row-101\">\n\t<td class=\"column-1\">disconnecteur annuel<\/td><td class=\"column-2\">backflow preventer annual<\/td>\n<\/tr>\n<tr class=\"row-102\">\n\t<td class=\"column-1\">disconnecteur semestriel<\/td><td class=\"column-2\">backflow preventer semi-annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-103\">\n\t<td class=\"column-1\">dispositifs de protection contre la foudre<\/td><td class=\"column-2\">lightning protection devices\u00a0<\/td>\n<\/tr>\n<tr class=\"row-104\">\n\t<td class=\"column-1\">document unique &#8211; annuel<\/td><td class=\"column-2\">single document &#8211; annual<\/td>\n<\/tr>\n<tr class=\"row-105\">\n\t<td class=\"column-1\">echafaudages examens de conservation &#8211; trimestriel<\/td><td class=\"column-2\">scaffolding conservation reviews &#8211; quarterly<\/td>\n<\/tr>\n<tr class=\"row-106\">\n\t<td class=\"column-1\">echelles en bois<\/td><td class=\"column-2\">wooden ladders<\/td>\n<\/tr>\n<tr class=\"row-107\">\n\t<td class=\"column-1\">eclairage de securite mensuel<\/td><td class=\"column-2\">safety lighting monthly<\/td>\n<\/tr>\n<tr class=\"row-108\">\n\t<td class=\"column-1\">eclairage de securite semestriel<\/td><td class=\"column-2\">safety lighting semi-annual<\/td>\n<\/tr>\n<tr class=\"row-109\">\n\t<td class=\"column-1\">ensemble de protection contr\u00f4lables (dont disconnecteurs)<\/td><td class=\"column-2\">set of verifiable protections (including backflow preventer)<\/td>\n<\/tr>\n<tr class=\"row-110\">\n\t<td class=\"column-1\">entretien annuel pour chaudi\u00e9re\u00a0\u00a04 kw < p >400 kw<\/td><td class=\"column-2\">annual maintenance for boiler 4 kw <p <400 kw<\/td>\n<\/tr>\n<tr class=\"row-111\">\n\t<td class=\"column-1\">equipement de protection individuelle<\/td><td class=\"column-2\">personal protective equipment<\/td>\n<\/tr>\n<tr class=\"row-112\">\n\t<td class=\"column-1\">equipement de protection individuelle annuel<\/td><td class=\"column-2\">personal protective equipment annual<\/td>\n<\/tr>\n<tr class=\"row-113\">\n\t<td class=\"column-1\">equipement sous pression<\/td><td class=\"column-2\">equipment under pressure<\/td>\n<\/tr>\n<tr class=\"row-114\">\n\t<td class=\"column-1\">equipement sous pression 10 ans<\/td><td class=\"column-2\">equipment under pressure 10 years<\/td>\n<\/tr>\n<tr class=\"row-115\">\n\t<td class=\"column-1\">equipement sous pression 18 mois<\/td><td class=\"column-2\">equipment under pressure 18 months<\/td>\n<\/tr>\n<tr class=\"row-116\">\n\t<td class=\"column-1\">equipement sous pression 3 ans<\/td><td class=\"column-2\">equipment under pressure 3 years<\/td>\n<\/tr>\n<tr class=\"row-117\">\n\t<td class=\"column-1\">equipement sous pression 40 mois<\/td><td class=\"column-2\">equipment under pressure 40 months<\/td>\n<\/tr>\n<tr class=\"row-118\">\n\t<td class=\"column-1\">equipement sous pression 5 ans<\/td><td class=\"column-2\">equipment under pressure 5 years<\/td>\n<\/tr>\n<tr class=\"row-119\">\n\t<td class=\"column-1\">equipement sous pression annuel<\/td><td class=\"column-2\">equipment under pressure annual<\/td>\n<\/tr>\n<tr class=\"row-120\">\n\t<td class=\"column-1\">equipement sous pression mise en service<\/td><td class=\"column-2\">equipment under pressure commissioning<\/td>\n<\/tr>\n<tr class=\"row-121\">\n\t<td class=\"column-1\">etanch\u00e9it\u00e9 des r\u00e9tentions transformateurs<\/td><td class=\"column-2\">transformer retentions seals<\/td>\n<\/tr>\n<tr class=\"row-122\">\n\t<td class=\"column-1\">extincteurs mobiles annuel apsad<\/td><td class=\"column-2\">mobile extinguishers annual apsad<\/td>\n<\/tr>\n<tr class=\"row-123\">\n\t<td class=\"column-1\">extincteurs mobiles trimestriels apsad<\/td><td class=\"column-2\">extinguishers mobile quarterly apsad<\/td>\n<\/tr>\n<tr class=\"row-124\">\n\t<td class=\"column-1\">extinction automatique a eau annuel<\/td><td class=\"column-2\">automatic water sprinklers annual<\/td>\n<\/tr>\n<tr class=\"row-125\">\n\t<td class=\"column-1\">extinction automatique a eau mensuel<\/td><td class=\"column-2\">automatic water sprinkler monthly<\/td>\n<\/tr>\n<tr class=\"row-126\">\n\t<td class=\"column-1\">extinction automatique a eau semestriel<\/td><td class=\"column-2\">automatic water sprinklers semi-annual<\/td>\n<\/tr>\n<tr class=\"row-127\">\n\t<td class=\"column-1\">extinction automatique a eau trentenaire<\/td><td class=\"column-2\">automatic water sprinklers thirty months<\/td>\n<\/tr>\n<tr class=\"row-128\">\n\t<td class=\"column-1\">extinction automatique a eau triennale<\/td><td class=\"column-2\">automatic water sprinklers triennial<\/td>\n<\/tr>\n<tr class=\"row-129\">\n\t<td class=\"column-1\">extinction automatique a eau trimestriel<\/td><td class=\"column-2\">automatic water sprinkler quarterly<\/td>\n<\/tr>\n<tr class=\"row-130\">\n\t<td class=\"column-1\">fluides frigorigenes<\/td><td class=\"column-2\">refrigerants<\/td>\n<\/tr>\n<tr class=\"row-131\">\n\t<td class=\"column-1\">fluides frigorigenes annuel n\u00b02<\/td><td class=\"column-2\">refrigerants annual no. 2<\/td>\n<\/tr>\n<tr class=\"row-132\">\n\t<td class=\"column-1\">fluides frigorigenes annuel_contr\u00f4le \u00e9tanch\u00e9it\u00e9<\/td><td class=\"column-2\">refrigerants annual_check sealing<\/td>\n<\/tr>\n<tr class=\"row-133\">\n\t<td class=\"column-1\">fluides frigorigenes semestriel<\/td><td class=\"column-2\">refrigerants semi-annually<\/td>\n<\/tr>\n<tr class=\"row-134\">\n\t<td class=\"column-1\">fluides frigorigenes trimestriel<\/td><td class=\"column-2\">refrigerants quarterly<\/td>\n<\/tr>\n<tr class=\"row-135\">\n\t<td class=\"column-1\">foudre &#8211; analyse des risques foudre (arf )\u00a0<\/td><td class=\"column-2\">lightning &#8211; lightning risk analysis (lra)\u00a0<\/td>\n<\/tr>\n<tr class=\"row-136\">\n\t<td class=\"column-1\">foudre &#8211; etude technique suite \u00e0 l arf\u00a0<\/td><td class=\"column-2\">lightning &#8211; technical study following the lra\u00a0<\/td>\n<\/tr>\n<tr class=\"row-137\">\n\t<td class=\"column-1\">foudre &#8211; verification biannuelle compl\u00e9te des installations\u00a0<\/td><td class=\"column-2\">lightning &#8211; biannual verification of complete installations\u00a0<\/td>\n<\/tr>\n<tr class=\"row-138\">\n\t<td class=\"column-1\">foudre &#8211; verification visuelle annuelle des dispositifs\u00a0<\/td><td class=\"column-2\">lightning &#8211; annual visual verification of devices\u00a0<\/td>\n<\/tr>\n<tr class=\"row-139\">\n\t<td class=\"column-1\">foudre 1 an ( erp )<\/td><td class=\"column-2\">lightning 1 year (erp)<\/td>\n<\/tr>\n<tr class=\"row-140\">\n\t<td class=\"column-1\">foudre 3 mois\u00a0<\/td><td class=\"column-2\">lightning 3 months\u00a0<\/td>\n<\/tr>\n<tr class=\"row-141\">\n\t<td class=\"column-1\">foudre 5 ans igh<\/td><td class=\"column-2\">lightning 5 years igh<\/td>\n<\/tr>\n<tr class=\"row-142\">\n\t<td class=\"column-1\">gaz combustibles<\/td><td class=\"column-2\">combustible gases\u00a0<\/td>\n<\/tr>\n<tr class=\"row-143\">\n\t<td class=\"column-1\">gaz combustibles annuel<\/td><td class=\"column-2\">gas fuels annual<\/td>\n<\/tr>\n<tr class=\"row-144\">\n\t<td class=\"column-1\">groupes \u00e9lectrog\u00e8nes<\/td><td class=\"column-2\">generator sets<\/td>\n<\/tr>\n<tr class=\"row-145\">\n\t<td class=\"column-1\">icpe ( dc) &#8211; contr\u00f4le p\u00e9riodique des installations soumises \u00e0 d\u00e9claration avec contr\u00f4le\u00a0<\/td><td class=\"column-2\">bpi (dc) &#8211; periodic inspection of installations subject to declaration with control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-146\">\n\t<td class=\"column-1\">icpe 2910 ( dc ) &#8211; contr\u00f4le quinquennal des installations de combustion soumises \u00e0 d\u00e9claration avec contr\u00f4le<\/td><td class=\"column-2\">bpi 2910 (dc) &#8211; five-year control of combustion installations subject to declaration with control<\/td>\n<\/tr>\n<tr class=\"row-147\">\n\t<td class=\"column-1\">incendie<\/td><td class=\"column-2\">fire<\/td>\n<\/tr>\n<tr class=\"row-148\">\n\t<td class=\"column-1\">incendie &#8211; extinction automatique a gaz annuel<\/td><td class=\"column-2\">fire &#8211; automatic fire suppression using gas annual<\/td>\n<\/tr>\n<tr class=\"row-149\">\n\t<td class=\"column-1\">instalations thermiques\u00a0\u00a0p > 2mw\u00a0\u00a0contr\u00f4le cha\u00eene de coupure automatique\u00a0<\/td><td class=\"column-2\">thermal installations p> 2mw automatic switching channel control\u00a0\u00a0<\/td>\n<\/tr>\n<tr class=\"row-150\">\n\t<td class=\"column-1\">installations de combustion soumises \u00e0 autorisation &#8211; mesure des rejets atmosph\u00e9riques<\/td><td class=\"column-2\">combustion installations subject to authorisation &#8211; measurement of atmospheric emissions\u00a0<\/td>\n<\/tr>\n<tr class=\"row-151\">\n\t<td class=\"column-1\">installations d&#8217;extinctions (halon, co2) semestriel<\/td><td class=\"column-2\">extinguishing installation (halon, co2) semi-annual<\/td>\n<\/tr>\n<tr class=\"row-152\">\n\t<td class=\"column-1\">installations electriques<\/td><td class=\"column-2\">electrical installations<\/td>\n<\/tr>\n<tr class=\"row-153\">\n\t<td class=\"column-1\">installations electriques annuel<\/td><td class=\"column-2\">electrical installations annual<\/td>\n<\/tr>\n<tr class=\"row-154\">\n\t<td class=\"column-1\">installations medicales pour erp &#8211; fluides m\u00e9dicaux<\/td><td class=\"column-2\">medical facilities for erp &#8211; medical fluids<\/td>\n<\/tr>\n<tr class=\"row-155\">\n\t<td class=\"column-1\">installations thermiques<\/td><td class=\"column-2\">thermal plants\u00a0<\/td>\n<\/tr>\n<tr class=\"row-156\">\n\t<td class=\"column-1\">installations thermiques 3 ans<\/td><td class=\"column-2\">thermal installations 3 years<\/td>\n<\/tr>\n<tr class=\"row-157\">\n\t<td class=\"column-1\">installations thermiques annuel<\/td><td class=\"column-2\">thermal installations annual<\/td>\n<\/tr>\n<tr class=\"row-158\">\n\t<td class=\"column-1\">installations thermiques zone de protection sp\u00e9ciale (zps)<\/td><td class=\"column-2\">thermal installations special protection area (spa)<\/td>\n<\/tr>\n<tr class=\"row-159\">\n\t<td class=\"column-1\">installations thermiques zone de protection sp\u00e9ciale biannuel, p > 2mw<\/td><td class=\"column-2\">thermal systems special protection area, biannual p> 2mw<\/td>\n<\/tr>\n<tr class=\"row-160\">\n\t<td class=\"column-1\">interphonie &#8211; video surveillance &#8211; sonorisation de securite semestriel<\/td><td class=\"column-2\">intercom &#8211; video surveillance &#8211; sound for security semi-annual<\/td>\n<\/tr>\n<tr class=\"row-161\">\n\t<td class=\"column-1\">legionelle conditionnement air<\/td><td class=\"column-2\">legionella air conditioning\u00a0<\/td>\n<\/tr>\n<tr class=\"row-162\">\n\t<td class=\"column-1\">legionelle ecs<\/td><td class=\"column-2\">legionella ecs<\/td>\n<\/tr>\n<tr class=\"row-163\">\n\t<td class=\"column-1\">legionelle tour a\u00e9ro<\/td><td class=\"column-2\">legionella aero towers\u00a0<\/td>\n<\/tr>\n<tr class=\"row-164\">\n\t<td class=\"column-1\">legionelle tour a\u00e9ro (autorisation) mensuel<\/td><td class=\"column-2\">legionella aero towers (authorisation) monthly<\/td>\n<\/tr>\n<tr class=\"row-165\">\n\t<td class=\"column-1\">legionelle tour a\u00e9ro (d\u00e9claration) bimestriel<\/td><td class=\"column-2\">legionella aero towers (declaration) bimonthly<\/td>\n<\/tr>\n<tr class=\"row-166\">\n\t<td class=\"column-1\">legionelles<\/td><td class=\"column-2\">legionella<\/td>\n<\/tr>\n<tr class=\"row-167\">\n\t<td class=\"column-1\">levage et manutention annuel<\/td><td class=\"column-2\">lifting and handling annual<\/td>\n<\/tr>\n<tr class=\"row-168\">\n\t<td class=\"column-1\">levage et manutention semestriel<\/td><td class=\"column-2\">lifting and handling semi annual<\/td>\n<\/tr>\n<tr class=\"row-169\">\n\t<td class=\"column-1\">levage et manutention trimestriel<\/td><td class=\"column-2\">lifting and handling quarterly<\/td>\n<\/tr>\n<tr class=\"row-170\">\n\t<td class=\"column-1\">machines<\/td><td class=\"column-2\">machines<\/td>\n<\/tr>\n<tr class=\"row-171\">\n\t<td class=\"column-1\">machines annuelle<\/td><td class=\"column-2\">machines annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-172\">\n\t<td class=\"column-1\">machines semestriel<\/td><td class=\"column-2\">machines semi-annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-173\">\n\t<td class=\"column-1\">machines trimestrielle<\/td><td class=\"column-2\">machines quarterly\u00a0<\/td>\n<\/tr>\n<tr class=\"row-174\">\n\t<td class=\"column-1\">materiel domaine hospitalier erp<\/td><td class=\"column-2\">hospital type equipment erp<\/td>\n<\/tr>\n<tr class=\"row-175\">\n\t<td class=\"column-1\">mesurage de l&#8217;exposition au bruit pour les salari\u00e9s _ 5 ans<\/td><td class=\"column-2\">measurement of exposure to noise for employees _ 5 years<\/td>\n<\/tr>\n<tr class=\"row-176\">\n\t<td class=\"column-1\">mesures sonores zone imi\/sl<\/td><td class=\"column-2\">sound measurements area imi \/ sl<\/td>\n<\/tr>\n<tr class=\"row-177\">\n\t<td class=\"column-1\">moyens de secours annuel<\/td><td class=\"column-2\">rescue methods annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-178\">\n\t<td class=\"column-1\">moyens de secours semestriel<\/td><td class=\"column-2\">rescue methods semi-annual<\/td>\n<\/tr>\n<tr class=\"row-179\">\n\t<td class=\"column-1\">nir (note d&#8217;information r\u00e9glementaire)<\/td><td class=\"column-2\">nri (note on regulatory information )<\/td>\n<\/tr>\n<tr class=\"row-180\">\n\t<td class=\"column-1\">note d&#8217;organisation<\/td><td class=\"column-2\">organizational note<\/td>\n<\/tr>\n<tr class=\"row-181\">\n\t<td class=\"column-1\">plan de pr\u00e9vention<\/td><td class=\"column-2\">prevention plan<\/td>\n<\/tr>\n<tr class=\"row-182\">\n\t<td class=\"column-1\">ponts roulants<\/td><td class=\"column-2\">overhead cranes<\/td>\n<\/tr>\n<tr class=\"row-183\">\n\t<td class=\"column-1\">portes et portails<\/td><td class=\"column-2\">doors and gates<\/td>\n<\/tr>\n<tr class=\"row-184\">\n\t<td class=\"column-1\">portes et portails\u00a0\u00a0annuel<\/td><td class=\"column-2\">doors and portals annual<\/td>\n<\/tr>\n<tr class=\"row-185\">\n\t<td class=\"column-1\">portes et portails\u00a0\u00a0semestriel\u00a0<\/td><td class=\"column-2\">doors and portals semi-annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-186\">\n\t<td class=\"column-1\">rayonnements ionisants et non ionisants<\/td><td class=\"column-2\">ionizing and non-ionizing radiation<\/td>\n<\/tr>\n<tr class=\"row-187\">\n\t<td class=\"column-1\">rayonnements ionisants et non ionisants annuel<\/td><td class=\"column-2\">ionizing and non-ionizing radiation annual<\/td>\n<\/tr>\n<tr class=\"row-188\">\n\t<td class=\"column-1\">re qualification annuelle autoclave<\/td><td class=\"column-2\">annual autoclave requalification\u00a0<\/td>\n<\/tr>\n<tr class=\"row-189\">\n\t<td class=\"column-1\">re qualification annuelle laveur<\/td><td class=\"column-2\">annual scrubber requalification<\/td>\n<\/tr>\n<tr class=\"row-190\">\n\t<td class=\"column-1\">relev\u00e9 des consommations<\/td><td class=\"column-2\">survey of consumptions<\/td>\n<\/tr>\n<tr class=\"row-191\">\n\t<td class=\"column-1\">rendement chaudiere trim<\/td><td class=\"column-2\">trim boiler efficiency\u00a0<\/td>\n<\/tr>\n<tr class=\"row-192\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s de liquides inflammables &#8211; icpe installations existantes &#8211; contr\u00f4le d&#8217;\u00e9tanch\u00e9it\u00e9 5 ans<\/td><td class=\"column-2\">underground tanks of flammable liquids &#8211; bpi existing installations &#8211; leakage check every 5 years<\/td>\n<\/tr>\n<tr class=\"row-193\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s de liquides inflammables &#8211; icpe installations existantes &#8211; degazage, nettoyage 5 ans<\/td><td class=\"column-2\">underground tanks of flammable liquids &#8211; bpi existing installations &#8211; degassing, cleaning 5 years<\/td>\n<\/tr>\n<tr class=\"row-194\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s de liquides inflammables &#8211; icpe installations nouvelles &#8211; contr\u00f4le de l\u2019absence de liquide au point bas\u00a0<\/td><td class=\"column-2\">buried tanks of flammable liquids &#8211; bpi new installations &#8211; testing of the absence of liquid at low point\u00a0<\/td>\n<\/tr>\n<tr class=\"row-195\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s de liquides inflammables &#8211; icpe installations nouvelles &#8211; contr\u00f4le et test du syst\u00e8me de d\u00e9tection 5 ans<\/td><td class=\"column-2\">underground tanks of flammable liquids &#8211; bpi new installations &#8211; control and testing of the detection system 5 years<\/td>\n<\/tr>\n<tr class=\"row-196\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s de liquides inflammables &#8211; icpe installations nouvelles &#8211; test du fonctionnement des alarmes annuel<\/td><td class=\"column-2\">underground tanks of flammable liquids &#8211; bpi new installations &#8211; test the operability of alarms annual<\/td>\n<\/tr>\n<tr class=\"row-197\">\n\t<td class=\"column-1\">reservoirs enterr\u00e9s, simples enveloppe, de liquides inflammables &#8211; icpe installations existantes &#8211; suivi du volume de produit\u00a0<\/td><td class=\"column-2\">underground tanks, single envelope, flammable liquids &#8211; bpi existing installations &#8211; monitoring the volume of product\u00a0<\/td>\n<\/tr>\n<tr class=\"row-198\">\n\t<td class=\"column-1\">ria annuel<\/td><td class=\"column-2\">ria annual<\/td>\n<\/tr>\n<tr class=\"row-199\">\n\t<td class=\"column-1\">s\u00e9curit\u00e9-incendie 6 mois<\/td><td class=\"column-2\">fire safety 6 months<\/td>\n<\/tr>\n<tr class=\"row-200\">\n\t<td class=\"column-1\">separateur hydrocarbure annuel<\/td><td class=\"column-2\">hydrocarbon separator annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-201\">\n\t<td class=\"column-1\">sols<\/td><td class=\"column-2\">soils<\/td>\n<\/tr>\n<tr class=\"row-202\">\n\t<td class=\"column-1\">stockage de produits corrosifs annuel<\/td><td class=\"column-2\">storage of corrosive products annual\u00a0<\/td>\n<\/tr>\n<tr class=\"row-203\">\n\t<td class=\"column-1\">stockage de produits dangereux 10 ans<\/td><td class=\"column-2\">storage of hazardous materials 10 years<\/td>\n<\/tr>\n<tr class=\"row-204\">\n\t<td class=\"column-1\">stockage de produits dangereux 5 ans<\/td><td class=\"column-2\">storage of hazardous products 5 years<\/td>\n<\/tr>\n<tr class=\"row-205\">\n\t<td class=\"column-1\">stockages<\/td><td class=\"column-2\">storage areas<\/td>\n<\/tr>\n<tr class=\"row-206\">\n\t<td class=\"column-1\">surete<\/td><td class=\"column-2\">security<\/td>\n<\/tr>\n<tr class=\"row-207\">\n\t<td class=\"column-1\">syst\u00e9me de climatisation r\u00e9versible et pompe \u00e0 chaleur &#8211; puiss. nominale frigo > 100 kwatt &#8211; contr\u00f4le quinquennal<\/td><td class=\"column-2\">air conditioning and heat pump system &#8211; pwr. rated refrigeration > 100 kw &#8211; five year control\u00a0<\/td>\n<\/tr>\n<tr class=\"row-208\">\n\t<td class=\"column-1\">syst\u00e9me de climatisation r\u00e9versible et pompe \u00e0 chaleur &#8211; puiss. nominale frigo > 12 kwatt &#8211; contr\u00f4le quinquennal<\/td><td class=\"column-2\">reversible air conditioning and heat pump system &#8211; pwr. rated refrigeration > 12 kw &#8211; five year controll<\/td>\n<\/tr>\n<tr class=\"row-209\">\n\t<td class=\"column-1\">systeme de securite incendie\u00a0\u00a0erp annuel<\/td><td class=\"column-2\">fire safety system erp annual<\/td>\n<\/tr>\n<tr class=\"row-210\">\n\t<td class=\"column-1\">systeme de securite incendie triennal<\/td><td class=\"column-2\">fire safety system triennial<\/td>\n<\/tr>\n<tr class=\"row-211\">\n\t<td class=\"column-1\">systeme management qhse<\/td><td class=\"column-2\">qhse management system<\/td>\n<\/tr>\n<tr class=\"row-212\">\n\t<td class=\"column-1\">thermographie par infrarouge<\/td><td class=\"column-2\">thermography using infrared<\/td>\n<\/tr>\n<tr class=\"row-213\">\n\t<td class=\"column-1\">tours aero annuel maintenance<\/td><td class=\"column-2\">aero towers annual maintenance<\/td>\n<\/tr>\n<tr class=\"row-214\">\n\t<td class=\"column-1\">transformateurs<\/td><td class=\"column-2\">transformers<\/td>\n<\/tr>\n<tr class=\"row-215\">\n\t<td class=\"column-1\">tuyauteries enterr\u00e9es des reservoirs enter\u00e9es de liquides inflammables &#8211; icpe installations existantes &#8211; contr\u00f4le d&#8217;\u00e9tanch\u00e9it\u00e9 10 ans\u00a0<\/td><td class=\"column-2\">buried pipes from underground tanks of flammable liquids &#8211; bpi existing installations &#8211; leak check 10 years\u00a0<\/td>\n<\/tr>\n<tr class=\"row-216\">\n\t<td class=\"column-1\">verification des dispositifs d&#8217;ancrage annuel<\/td><td class=\"column-2\">verification of anchor devices annual<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Glossario meccanica francese\/inglese<\/p>\n","protected":false},"featured_media":977,"template":"","categoria_glossario":[10,27],"class_list":["post-976","glossari","type-glossari","status-publish","has-post-thumbnail","hentry","categoria_glossario-informatica","categoria_glossario-telecomunicazioni"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/glossari\/976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/glossari"}],"about":[{"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/types\/glossari"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/media\/977"}],"wp:attachment":[{"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/media?parent=976"}],"wp:term":[{"taxonomy":"categoria_glossario","embeddable":true,"href":"https:\/\/www.lipsie.com\/it\/risorse-traduzioni\/wp-json\/wp\/v2\/categoria_glossario?post=976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}